Firm high-ground blocks
Blocks on the highest firm ground at the site, placed above the mark and with a route out the crew can use in wet weather.
Placement above the flood line, alternate sites and a plan to move units out of low ground when the Ohio River rises.
Fastest: call (888) 351-0294. Or send this and we call you back.
Riverfront and flood-season restrooms are placed above a recorded high-water mark, on firm ground with a clear route out, and kept with an alternate site in case the river rises. An Ohio River flood cancelled the 2025 Thunder Over Louisville show, which is the one flood fact this page relies on, and it does not generalise that to the city's flood risk.
The Ohio River is the reason riverfront ground in Louisville needs a different kind of restroom plan. A site that is dry in April can be under water by the time a spring event arrives, and a unit left on low ground can be lost, damaged or left standing in a flood.
We do not state a general flood risk for the city, because the sourced material does not give one. We do plan each riverfront site from the high-water mark the organiser can show, and we keep an alternate site for any event where the river is a real possibility.
The high-water mark is the line the river has reached before, and units belong above it with a margin, because a mark from a past flood is the most reliable guide the site offers.
Where the organiser can show the mark, from a previous flood or from a survey, the technician records it and places units above it. Where no mark is known the site is treated as low, and the plan waits for the owner's record before fixing the layout.
A margin above the mark is sensible. The river can rise above a past mark, and a unit set right on the line leaves no room for that.
The alternate site is higher, firm and reachable by the same servicing truck, and it is chosen before the event, so the change is a short move rather than a search on the day.
An alternate site that is hard to reach is no alternate at all. The truck must be able to reach it, the crowd must be able to find it and the units must stand on firm ground, all of which is checked on foot.
The alternate site is drawn on the plan with its own count, so the organiser can show the office the fallback as well as the main layout.
Units on low ground are moved before the water arrives, on a set decision point, and the move is planned so the trucks are not caught in the flood.
A move is planned for the decision point, not for the moment the water arrives. The trucks go in while the ground is still passable, and the units are placed on the alternate site before the crowd is sent there.
A unit that cannot be moved in time is collected or left to the owner's instruction, and the plan says which.
Once the water recedes, the site is checked for damage, the units are cleaned or replaced and the record is updated before the next event on the same ground.
Flood water leaves silt, debris and sometimes a damaged pad. The crew inspects the site and the units, and any unit that has been in water is withdrawn rather than cleaned and reused.
The record of the flood, the mark and the decisions is kept with the plan, so the next event on the same ground starts from what was learned.
The high-water mark, the decision point and the move record are kept with the plan, so a site that floods once is planned from its own history the next time.
A flood leaves a record: the mark on a wall, the date the units were moved and the state the spot was left in. Those are written onto the site's plan, and the next event on the same ground starts from them.
A record like this is also the honest answer to a question from a venue or an office about what happened last time.
After a flood the riverfront ground is silted and sometimes damaged, and the units placed there are inspected and cleaned before they are used again.
Flood water leaves mud and debris on the ground and on the units. Any unit that has stood in water is withdrawn rather than cleaned and reused, and the ground is checked before the next placement.
The record of the flood and the mark it left is kept with the plan, so the next placement starts from what was learned.
Do not walk into floodwater or wet mud near the river to reach a unit. Keep away from the water's edge and from any utility line that may be in the water, and report a unit that is in water or leaning to the supervisor at once.
The organiser or the site owner gives the high-water mark for the ground, and the technician records it on the plan. Where no mark is known the site is treated as low until it is checked.
Units go on firm ground above the recorded mark, with a clear route out, and not in a low corner or a hollow that collects water.
An alternate site, higher and firm, is chosen and drawn on the plan, with a smaller set of units held ready for it.
The organiser and the technician agree the river level or forecast at which the units are moved or collected, and that point is written on the plan.
When the decision point is reached, the units are moved to the alternate site, held back or collected, and the crew is told which applies.
Blocks on the highest firm ground at the site, placed above the mark and with a route out the crew can use in wet weather.
A smaller set held ready for the alternate site, so the crowd can be served if the riverfront ground is closed.
A written plan for collecting units quickly when the river rises, so no unit is left in water.
Call any hour and explain what is going on. You get a clear price before any work starts.
The Ohio River flooded in the spring of 2025 and cancelled the Thunder Over Louisville show. That is the one flood fact this page relies on, and it is not generalised to every riverfront site.
Riverfront ground in Louisville sits beside the river's own banks and its low walks, and the plan records the high-water mark for each site it uses.
The river is also the boundary with southern Indiana. A site on the Indiana bank has its own ground, its own rules and its own high-water mark, and is planned separately.
Unit counts and layouts for a riverfront fireworks show, planned against a date that can move and a river that can rise.
Units for events and jobs in Clark, Floyd and Harrison county towns across the river, planned to the rules that apply on the Indiana side.
Unit counts, layouts and servicing for park events, festivals and community days, with the Metro file prepared where it applies.
A trailer with flush toilets and sinks for a full event day or a long job, set on a checked route with its power and drain arranged.
Handwashing with running water and drainage, placed beside the restrooms for festival food, stadium lots and job crews.
Not sure if you're covered? Check your ZIP code.
Ohio River flood seasons change riverfront restroom plans because they change which ground is usable.
Louisville restroom plans can serve Clark, Floyd and Harrison counties in Indiana, but Indiana's septage and event rules are not Kentucky's.
Units are placed above the recorded high-water mark and moved or collected at the decision point. A unit in floodwater is not reused.
This page does not state a city-wide flood risk, because none was sourced for it. The high-water mark for the site is the figure the plan uses.
The decision point set with the organiser decides whether units are moved, held or collected, and the crew carries out the agreed step.
Only on firm ground above the mark and off the walk's main line. A unit on a boardwalk or a low walk is not placed without the technician's check.
They have their own ground and their own rules, and each is planned separately with its own high-water mark.